HomeComputingComputersComputer ComponentsFans & CoolingCPU Cooling Fans20pcs 450V 22uf 105℃ Long Leads Axial Electrolytic Polarize
product_image_name-Generic-20pcs 450V 22uf 105℃ Long Leads Axial Electrolytic Polarize-1product_image_name-Generic-20pcs 450V 22uf 105℃ Long Leads Axial Electrolytic Polarize-2product_image_name-Generic-20pcs 450V 22uf 105℃ Long Leads Axial Electrolytic Polarize-3product_image_name-Generic-20pcs 450V 22uf 105℃ Long Leads Axial Electrolytic Polarize-4product_image_name-Generic-20pcs 450V 22uf 105℃ Long Leads Axial Electrolytic Polarize-5product_image_name-Generic-20pcs 450V 22uf 105℃ Long Leads Axial Electrolytic Polarize-6product_image_name-Generic-20pcs 450V 22uf 105℃ Long Leads Axial Electrolytic Polarize-7

Share this product

Shipped from abroad

20pcs 450V 22uf 105℃ Long Leads Axial Electrolytic Polarize

KSh 607
KSh 1,15047%

In stock

+ shipping from KSh 112 to CBD - UON/Globe/Koja/River Road
0 out of 5
(No ratings available)

Promotions

Delivery & Returns

Shipped from abroad 

Choose your location

Pickup Station

Delivery Fees KSh 112
Ready for pickup between 07 May and 09 May if you place your order within the next 3hrs 54mins

Door Delivery

Delivery Fees KSh 202
Ready for delivery between 07 May and 09 May if you place your order within the next 3hrs 54mins

Return Policy

Easy Return, Quick Refund.Details

Seller Information

BeeMe

74%Seller Score

64 Followers

Follow

Seller Performance

Shipping speed: Good

Quality Score: Excellent

Customer Rating: Poor

Product details


Features:
High qua
lity electrolytic capacitors with stable performance.
The specifications of the capacitors is marked on its surface, convenient to use.
Heat resisting, low leakage, low loss and low impedance.
Great choice for electronic professionals or enthusiasts.
Suitable for a wide range of
electronic applications.


Specifications:
Working Voltage: DC 450V
Surge voltage: DC 500V
Value: 22uf
Capacitance Tolerance: ±20%
Operating temperature: 105℃
Dissipation Factor:

Specifications

Key Features

  • High quality electrolytic capacitors with stable performance
  • The specifications of the capacitors is marked on its surface, convenient to use
  • Heat resisting, low leakage, low loss and low impedance
  • Great choice for electronic professionals or enthusiasts
  • Suitable for a wide range of electronic applications

What’s in the box

20 x Electrolytic Capacitor
.

Specifications

  • SKU: GE840EA57EA4LNAFAMZ
  • Model: N/A
  • Production Country: China
  • Weight (kg): 0.083

Customer Feedback

This product has no ratings yet.

20pcs 450V 22uf 105℃ Long Leads Axial Electrolytic Polarize

20pcs 450V 22uf 105℃ Long Leads Axial Electrolytic Polarize

KSh 607
KSh 1,15047%
Questions about this product?

Recently Viewed

See All